Nine Elms is the intermediate station on the new branch of the London Underground's Northern Line from
Kennington to
Battersea Power Station.
|
51532 prepares to depart |
Information |
Type: |
Transport for London (London Underground Northern Line) |
Opened: |
2021 |
Platforms: |
2 |
The station was opened in 2021 along with the rest of the branch. Like Battersea Power Station, Nine Elms was designed (and financed) by the promise of future development around and above the station. Four hundred new homes are being built on top of the station along with new office space and retail.
The station is served by trains on the Northern Line's
Charing Cross branch. The platform level has a large open space between the two platforms.
|
Platform level |
|
51683 arrives with a Battersea Power Station bound service |
|
End of the platform |
|
Train approaching |
|
Between the platforms |